Esther Checklist Management.

Completed Actions in Shot, Report Id: 319

ID Order Date/Time Action Status Resp
3 10 2026-03-24 15:55:04.829974 Ensure gas supplies (for the Driver and the Test Gases) are OFF V CE
4 20 2026-03-24 15:55:12.107448 Ensure mechanical operator to wear proper PPE V CE
59 30 2026-03-24 15:55:59.848718 Turn ON water cooling pump. Check water running inside closed circuit. OPEN pneumatic air valves. V CE
5 40 2026-03-24 15:56:35.690718 Ensure every safety systems are ON and OK (fire alarm, emergency lighting, gas detection…) V CE
6 50 2026-03-24 15:57:18.180974 Ensure UPS of control room is ON, supplying computers, control panel and gas detection system. Ensure that the PLC control systems (in the control room and the experimental hall rack) are ON ATT CE
7 60 2026-03-24 15:57:35.365317 All doors to remain unlocked as normal for fire escape/access V CE
8 70 2026-03-24 15:58:17.462078 Turn ON necessary electrical equipment (computers, oscilloscopes, etc...) V RE
121 80 2026-03-24 15:59:00.392700 Ensure that all EPICS IOC systems are running. Start CSS Archive Engine. See <a href="https://github.com/ipfn-hpl/esther-ops#epics-control-system" target="_blank">Link</a> V RE
1 80 2026-03-24 16:02:23.995332 Initiate Shot - Assert Start of Day V RE
9 90 2026-03-24 16:02:43.917154 Make a realistic assessment on whether the test can be completed within the imparted time (e. g. if it is 16:00 maybe it is not a good idea to start a test if you plan to leave at 17:00). V RE
31 10 2026-03-24 16:04:09.188758 Verify that all other general and subsystem safety conditions are met (see Master checklist) V CE
33 20 2026-03-24 16:04:41.754313 Disable electrical supplies to all non-ATEX electrical equipment in the ATEX area V CE
34 30 2026-03-24 16:05:50.661278 Ensure all doors and gate from experimental hall are CLOSED V CE
35 40 2026-03-24 16:06:02.759187 Place the recoil dampening bags (Aluminium bullet bags) in contact with the rear of the combustion chamber. Ensure these do not block the laser optical path. V CE
37 50 2026-03-24 16:06:50.790592 Check for lack of human presence in the gas compressor room and CLOSE door V CE
38 60 2026-03-24 16:06:55.626002 Leave experimental hall and make visual check and audible warning V CE
41 70 2026-03-24 16:06:59.101611 CLOSE control room/lab door V CE
42 80 2026-03-24 16:09:56.327051 OPEN gas storage doors; Turn ON gas supplies; CLOSE and LOCK gas storage doors V CE
43 90 2026-03-24 16:10:33.638342 Log in to control console V RE
111 100 2026-03-24 16:10:38.897276 Check that Bottle pressure are compatible with planned shot V RE
110 110 2026-03-24 16:10:55.158583 Set Bottle low-pressure alarms according to states V RE
10 110 2026-03-24 16:11:35.610888 Agree and sign the global shot setup parameters sheet (driver, compression tube, and test section gas fillings, vacuum parameters, diagnostics, etc…). Ensure parameters are nominal for shot and all equipment is in good condition. Two signatures are needed in the compliance form. V CE
30 100 2026-03-24 16:11:38.290098 Agree and sign the global shot setup parameters sheet (driver, compression tube, and test section gas fillings, vacuum parameters, diagnostics, etc…). Ensure parameters are nominal for shot and all equipment is in good condition. Two signatures are needed in the compliance form. V RE
29 130 2026-03-24 16:11:47.881784 Ensure that at least one researcher and the chief engineer are present during the test, one to remain in control room throughout. V RE
11 120 2026-03-24 16:11:48.694825 Ensure that at least one researcher and the chief engineer are present during the test, one to remain in control room throughout. V CE
88 140 2026-03-24 16:12:55.809423 Check that the laser is aligned with the optical port. Open CC if needed. ATT RE
12 150 2026-03-24 16:13:08.967751 Ensure CC, CT and ST are clean. Perform hardware inspection. Place diaphragms in CC-CT, CT-ST, and ST-DT sections. V CE
13 160 2026-03-24 16:13:14.727307 Ensure there is no leaks of hydraulic fluid. Undertake hydraulic closure procedure for the CC-CT, CT-ST, and ST-DT sections (See Procedimento HPL-012020). V CE
44 120 2026-03-24 16:13:18.474896 Enter normalized parameters from log sheet V RE
45 130 2026-03-24 16:13:28.117802 Turn on Kistler & start archive engine V RE
58 10 2026-03-24 16:13:47.067914 Verify that all other general and subsystem safety conditions are met (see Master checklist) V CE
107 140 2026-03-24 16:13:50.814731 Fully open purge valve v701 V RE
108 150 2026-03-24 16:14:08.361529 Start CC Purging Sequence V RE
109 160 2026-03-24 16:14:17.915633 Fully close valve V701 then open half turn V RE
46 170 2026-03-24 16:14:52.179213 Initiate filling sequence V RE
14 170 2026-03-24 16:16:04.128304 Initiate Vacuum Procedure. V RE
32 20 2026-03-24 16:20:11.710152 Verify that all the sections of the shock-tube (CC-CT, CT-ST, ST-DT) are CLOSED with a diaphragm inside, and pressurized to the preset values in each station. Report the hydraulic pressure in each section. V RE
60 30 2026-03-24 16:20:25.471086 Turn ON the two turbomolecular pump fans V RE
61 40 2026-03-24 16:20:30.210965 Turn ON the two turbomolecular pump controllers and ensure that the pumps are levitating nominally without any error messages V RE
62 50 2026-03-24 16:20:46.858278 Ensure that the two ST gate valves are OPEN (if p_ST=1bar) and that the two mechanical arms are in the OPEN position V RE
63 60 2026-03-24 16:20:56.757498 Ensure that all the pressure sensors (1x CT, 2x ST, and 2x DT) are ON (turn then ON when required) ATT RE
64 70 2026-03-24 16:22:19.236347 Ensure that the CT ball valve is in the pump <-> CT section position and that the DT ball valve is in the pump <-> DT section position V RE
65 80 2026-03-24 16:23:13.441229 Ensure that all the control software is ON (boot it as needed) and that the archive engine is active V RE
66 90 2026-03-24 16:23:19.821450 Turn ON the DT primary pump V RE
67 100 2026-03-24 16:23:25.018420 After XXX seconds turn ON the CT primary pump V RE
69 110 2026-03-24 16:23:30.873041 After XXX seconds turn ON the ST primary pump. If gate valves are still CLOSED, open them after 1 min. V RE
70 120 2026-03-24 16:23:40.152604 After XXX seconds, ensure that the CT massflow controller is in the CLOSED position, then switch the CT ball valve to the gas-filling system <-> CT section position, wait YYY seconds, and switch back to the pump <-> CT section position, to purge the CT gas lines downstream of the massflow controller V RE
71 130 2026-03-24 16:23:47.418487 After pressure in the ST section falls in the 1e-1 mbar range, start the acceleration of both ST turbomolecular pumps V RE
104 140 2026-03-24 16:23:58.814930 (Optional) Once required pressure is met in ST section, CLOSE gate valves, wait 5min, then OPEN gate valves. NC RE
105 150 2026-03-24 16:24:05.245691 (Optional) Once required pressure is met in CT section, switch pneumatic valve from CT <-> Pump to CT <-> GFS, wait 5min, then switch back. NC RE
106 160 2026-03-24 16:24:13.592556 (Optional) Once required pressure is met in DT section, switch pneumatic valve from DT <-> Pump to DT <-> Purge, wait 5min, then switch back. ByP RE
72 170 2026-03-24 16:24:45.298153 When the required pressures in all the sections (CT, ST, DT) are met, initiate braking of Turbo Pumps. V RE
92 173 2026-03-24 16:24:51.179687 Switch pneumatic valve from DT <-> Pump to CT <-> Exhaust V RE
93 175 2026-03-24 16:24:54.729696 Turn off DT Primary pump V RE
90 180 2026-03-24 16:25:05.276858 Switch pneumatic valve from CT <-> Pump to CT <-> GFS V RE
84 10 2026-03-24 16:25:41.336568 Verify that all other general and subsystem safety conditions are met (see Master checklist) V CE
86 10 2026-03-24 16:26:20.872310 Verify that all other general and subsystem safety conditions are met (see Master checklist) V CE
89 15 2026-03-24 16:27:41.675679 Fill/check the parameters for CT & ST masscontrollers V RE
91 190 2026-03-24 16:28:11.692386 Turn off CT Primary pump and switch to Test Gases checklist. V RE
96 30 2026-03-24 16:28:20.851536 Perform Test Gases filling procedure for CT. Verify that the correct filling pressures have been reached. Resume Vacuum checklist. V RE
95 220 2026-03-24 16:28:33.662663 When both turbos < 5,000-10,000 RPM (TBC) close gate valves and switch to Test Gases checklist. V RE
97 40 2026-03-24 16:28:43.126304 Perform Test Gases filling procedure for ST. Verify that the correct filling pressures have been reached. Resume Vacuum checklist. V RE
99 230 2026-03-24 16:28:57.540064 Close shock insulation plugs and check they are in their CLOSED position. ATT RE
100 240 2026-03-24 16:29:06.046327 Check that both turbo pumps are in levitation position. Turn off pumps ventilation and controller (Optional). V RE
101 250 2026-03-24 16:29:11.801500 Shut down primary ST pump V RE
102 260 2026-03-24 16:32:52.246562 Manually pressurize the vacuum lines between the turbopumps and the primary pump. V RE
83 270 2026-03-24 16:33:05.002229 Verify subsystem safety conditions for Shot V CE
47 180 2026-03-24 16:33:14.589031 Record the partial filling pressures V RE
48 190 2026-03-24 16:33:18.495820 Check that fill is nominal and that the correct final pressure has been reached V RE
49 200 2026-03-24 16:33:25.637384 Check that CC is properly insulated from the piping system (Maximator valves closed) V RE
116 100 2026-03-24 16:33:57.844258 Verify subsystem safety conditions for Shot V CE
15 180 2026-03-24 16:34:20.145168 After the necessary time (experiment-dependent), initiate Combustion Driver procedure. V RE
16 190 2026-03-24 16:34:23.316942 After Vacuum procedure concludes, initiate Test Gas Filling procedure. V RE
50 210 2026-03-24 16:34:33.406407 Ensure that the Vacuum and test gas filling procedures have concluded successfully and that the shock-detection and diagnostic systems are ready for recording the shot and waiting for the triggers recorded at shock wave passage V RE
51 220 2026-03-24 16:34:43.061703 Prepare the Kistler gauge system to record the ignition sequence; program all the necessary triggers (oscilloscopes, acquisition cards, etc...) V RE
36 230 2026-03-24 16:34:50.442801 Turn ON laser ignition system V RE
117 195 2026-03-24 16:36:42.693065 Verify General and Subsystem safety conditions for ignition V CE
118 235 2026-03-24 16:37:18.110081 ARM Ignition Laser See <a href="https://github.com/ipfn-hpl/esther-ops/tree/main/pulse-sequence" target="_blank">Link</a> V RE
52 240 2026-03-24 16:38:51.337018 Fire the laser ignition system V RE
53 245 2026-03-24 16:39:07.706423 Record full pressures and volumes on log V RE
122 247 2026-03-24 16:39:36.541166 Set laser flash to Standby V RE
112 250 2026-03-24 16:39:46.576626 If CC NOT ignited, start CC ABORT sequence to flush mixture NC RE
54 290 2026-03-24 16:40:00.802999 Set control system to idle V RE
17 200 2026-03-24 16:40:34.040024 After shot is concluded, ensure that all the relevant data (pressures, diagnostics, etc…) are recorded, and that pressure inside the chamber (measured in the Dump Tank station is around atmospheric pressure, accounting for the sensor noise. ATT RE
18 210 2026-03-24 16:40:45.537481 Allow for additional 5min wait time for safety reasons. V RE
19 230 2026-03-24 16:40:54.400909 Turn ON the ST primary pump to vent out any leftover Helium and Water Vapour. When pressure is lower than 100mbar, turn OFF the ST primary pump. V RE
56 220 2026-03-24 16:43:31.474170 Enter lab and open doors. Perform a visual inspection V CE
20 240 2026-03-24 16:44:36.087011 Undertake hydraulic opening procedure (See Procedimento HPL-012020). V CE
124 245 2026-03-24 16:44:45.706047 Open CC/CT/ST/DT Sections V CE
21 250 2026-03-24 16:44:53.037017 Purge condensed water from the Dump Tank. V CE
22 260 2026-03-24 16:45:00.281418 Remove the burst-ed CC-CT, CT-ST, and ST-DT diaphragms. V CE
23 270 2026-03-24 16:45:08.417335 Check mechanical parts for damage, record for future maintenance. V CE
24 290 2026-03-24 16:45:21.435467 Sign test report. End of test. V CE
28 280 2026-03-24 16:45:24.404566 Sign test report with this form attached. End of test. V RE
123 300 2026-03-24 16:45:46.548295 If necessary perform End Of Day Checlists V RE
82 310 2026-03-24 16:47:31.126121 Turn OFF the water cooling circuit pump V CE
55 310 2026-03-24 16:50:59.409668 Open gas storage doors; Turn OFF gas supplies; Close and lock gas storage doors V CE
25 300 2026-03-24 16:55:04.124032 Turn OFF relevant electrical equipment (computers, oscilloscopes, etc…). V RE
26 320 2026-03-24 16:55:19.525249 General cross-check of the experimental hall, control room, and compressor room for any anomalies. V CE
103 330 2026-03-24 16:55:31.718826 Perform MySQL dump and backup to NAS V RE